May Day does not stop work, playing the song of workers
“May Day”During the holidays, front-line builders of various projects in the group shuttled between construction sites, keeping a close eye on node goals and working hard to build, setting off a craze for hard work during the holidays and playing a song of progress for workers.
Overseas Engineering Company No. 1
The new terminal of the Harare Airport project is about to be completed, and more than 450 people in the project department are on the front line of construction, making every effort to seize the project construction progress, and celebrating Labor Day with hard work and sweat. The crane is at full power, and the road roller shuttles back and forth. The terminal boarding bridges are gradually connected, and the parking lot and road works have entered the final sprint stage with everyone's efforts. The installation and debugging of electromechanical equipment go hand in hand, and ventilation, air conditioning, and aerospace display building control have also entered testing.
On the China Mining project, faced with tight construction requirements, heavy tasks and high quality, more than 400 workers stayed at their posts and made every effort to seize the project construction progress.
In Iraq, South Sudan, Tajikistan, Saudi Arabia……The company does not stop work on the construction site of each project, and uses enthusiasm and sweat to seize the construction period, grasp the progress, and ensure quality, composing a song of labor hymn.

Overseas Engineering Company No. 3
The construction site of the Ethiopian Museum project is a busy scene. In order to ensure the safe completion and delivery of the project as scheduled, a group of people“tiejun”Stay silently in ordinary positions. The project is in the decoration stage. The company has formulated a scientific construction plan to ensure that decoration materials arrive in time and increase the frequency of on-site inspections. Workers rush for the construction period and progress, overcome difficulties and move forward bravely, and forge ahead towards the handover of the project at the end of the year.
During the rainy season in South Sudan, workers at the construction site of the South Sudan Central Bank Building project seized the favorable conditions of fine weather and rushed to work hard despite the high temperatures. Large machinery such as tower cranes operate in turn, and steel workers, carpenters, bricklayers, and plumbers perform their duties and work together, fully demonstrating that“Do not relax during holidays, and do not stop working for safety”A lively construction scene.

GIC
At the construction site of the China-Arab (UAE) Production Capacity Cooperation Demonstration Park, workers are sweating hard to catch up with progress. They are working hard to promote the decoration of the second phase of the customized factory building, the final installation of electromechanical engineering (MEP), and the construction of outdoor roads and pipe networks, and cooperate with enterprises Carry out process installation submission, review and implementation. The second phase of the customized factory project is a high-end customized factory built for Hailong Petroleum, a company entering the park. At present, all concrete structure projects and steel structure installation projects have been completed, and the construction task is expected to be completed in August this year.

Construction Group
The construction group's 79 projects under construction at home and abroad are advancing in an orderly manner. In order to ensure the timely delivery of the projects, more than 11200 builders are stationed and working hard at their respective jobs, building high-quality construction projects with sweat and wisdom, and building high-quality construction projects in the motherland.“Belt and Road”The line shows the style of China craftsmen in the new era.

Zhongjiang Sanjian
Employees from the project departments of Zhongjiang Sanli Port Project, Nanjing Xiangyu Kindergarten Project, Xuzhuang Juzhiyuan Project, Runtai Phase 67 Project, Taizhou Data Park and other project departments are“May Day”Interpretation during the period with practical actions“the most glorious work”, they used their responsibility and perseverance to go all out to advance the project construction in an orderly manner. Tall buildings embody their dedication, and buildings are full of their hard work.

Zhongjiang Wujian
After four months, the Yancheng Tongwei project entered a comprehensive final construction stage. The largest concrete frame structure, w8, had been capped 10 days earlier than originally planned. Under the intensive, rigorous and orderly organization and arrangement of the Yancheng Project Headquarters, all members of the project team are united at this moment, working day and night to launch a charge towards the goal of completion by the end of May.
The Dongfang Electric (Xinjiang) Project Department and the builders of the Shanghai Fusheng Project also stick to the front line, vigorously promote the project progress, and make every effort to ensure the timely delivery of the project.

Canton Fair
“May Day”During this period, the 133rd Canton Fair was in the organizing stage of the third phase of the exhibition. People came and went on the scene. The group liaison officer and colleagues from chemical companies and import and export companies participating in the third phase were nervously and busy arranging the exhibition, negotiating the admission plan for exhibits, Following up on the decoration progress of each booth, and coordinating the processing of various certificates. Everyone worked hard to present products as soon as possible and improve the exhibition effect.

Zhongjiang Design Institute
Some employees of Zhongjiang Design Institute are“May Day”During this period, I stayed in my familiar job, devoted myself to my work with an selfless spirit, and stayed on the front line of production with full passion. Drawings were drawn one by one under their pen, and buildings rose from the drawings. They used their passionate youth to write magnificent blueprints.


