Zhongjiang Fifth Construction Project: Fight against high temperatures, ensure safety, and take multiple measures to stabilize production

   Since the beginning of summer, in the face of the rolling heat wave, the staff of Zhongjiang No.5 Construction has stuck to the front line of the project and accepted the high temperature.“Roast”test. In order to ensure safe production, each project department of the company has taken various measures to send coolness, safety and law to front-line employees.

   war heat

   The cement floor baked under the scorching sun is like a baking tray on the fire. The heat wave on the face makes people feel suffocating. The front-line employees of the project sweat like rain on their posts, interpreting the meaning of struggle with sweat.

   This summer, it is a big test for the fresh civil engineers who have just come out of the ivory tower and go to work.

   “As a new employee of the company, I just graduated from school and joined the big family of Zhongjiang Wujian. I followed the master to learn the whole construction process. Every day, under the scorching sun, arms and neck, obvious color difference soon appeared in the exposed part of the body. After half a day, my clothes were basically soaked with sweat. However, what I saw from the masters was the spirit of fighting without fear of hardship and courage to move forward. I was also deeply affected by them.”Li Dejin, who has just been on the job for a month, said.

   The construction workers of Tianneng T3 project stand in the steel bushes, transport pipes, concrete paving and compaction, check and adjust the construction details. The hot sun above their heads and the hot ground ensure that every link of the construction is tightly closed.

   Recently, Xinjiang has continuously issued high-temperature orange warning signals. The outdoor temperature has soared to 42°C, and the intensity of ultraviolet radiation is high. The employees of the fifth construction of Xinjiang Xingsen Coal Washery Project are not afraid.“Roast”Inspection, stick to the construction front-line posts, with their own hard work and sweat to compose a song of labor hymns of the scorching sun, resistance to high temperature, and progress.   

   Colleagues of Wuxi Zhuopin Project rush to the time limit for a project, ensure quality and catch up with the progress. In the hot weather, faces covered with sweat, tools soaked with sweat, and responsibilities dripping with sweat, speeding up the project construction and refreshing.“Progress bar”。

   Ensure safety

   With the increase of extreme weather such as heavy rain, strong wind and thunder during the summer high temperature and flood season, various safety risks in the project production are also intertwined and superimposed. In order to effectively do a good job in disaster prevention and mitigation and safe production during the summer high temperature and flood season of the project, the leaders of the Group Company will take the lead to inspect the projects under construction, and the branch company will“Four enhancements”Do a solid job of safety production, carry out safety production month activities, carry out special inspections during the summer and flood seasons of the project, and promote“One squatting point, two ledgers”Work, implement the group safety production“Six Major Systems”To ensure the smooth operation of the project construction.   

   Company through“Work safety department of the Branch-person in charge of safety of the regional company-person in charge of safety of the project department”The three-level management model, to create a regional company safety management structure, build a daily safety management system. Strengthen the safety management of the construction site, increase the frequency of safety inspection, strengthen the safety depth of special inspection, and eliminate potential safety hazards in time. Through the inspection of the digital project platform promoted by the group, problems can be found and rectified in time. Pay close attention to the weather forecast and prepare for extreme weather such as high temperature and heavy rain in advance. The project department strengthens the safety awareness education of employees, improves the prevention ability, and carries out diversified safety education and training to grasp the safety work from the source.

   send cool

   The Party Committee of the Group is highly concerned about the comrades on the front line of the project and sends care and coolness to the project department in the hot summer. Zhu Xinbao, general manager of the group, and his entourage came to the Jiangsu-Anhui Business Department of the Fifth Construction Company for investigation and guidance, carried out safety inspection, expressed condolences to front-line workers, and asked the project department to strengthen safety management in the face of flood season and high temperature weather, pay attention to nodes and links, strengthen investigation, and effectively eliminate potential safety hazards.

   Sun Guangeng, deputy secretary of the group's party committee, expressed condolences to the front-line employees on the Pingyao Yuhao project, asking the project department to tighten and compact the responsibility for safe production, pay special attention to the labor protection of employees in the high temperature season, and ensure a safe summer. He urged Wujian Company to continue to care for its employees, implement high-temperature and wrong-time operations, and ensure safe production.

   Company leaders will“Cool and refreshing”To Tianneng T3, Chongqing Yuhao, Shanghai Yifan, Xipur and other projects, to send salt soda, honeysuckle dew and other heatstroke prevention and cooling items to the workers, thank them for their hard work for the project construction, and urge them to pay attention to heatstroke prevention and cooling measures during high-temperature operations, pay attention to the combination of work and rest, and take good care of your health. With smiles on their faces, the workers received a cool gift.

   In the face of high temperature and intense heat, various project departments have implemented various measures to ensure a smooth summer. The project department will appropriately extend the working time in the morning and evening, increase the rest time in the high temperature period, reduce the labor intensity and reduce the risk of heatstroke. Provide front-line personnel with drinking tea and distribute medicines and materials for heatstroke prevention and cooling, so as to ensure the safety of front-line personnel while grasping the progress of the project.

   At the project site, from the first ray of sunshine in the morning to the last ray of afterglow at night, the employees of Wujian have always maintained a high work enthusiasm and rigorous work attitude. They cooperated closely and fought together to overcome one technical problem after another and overcome one engineering difficulty after another. Their hard work and selfless dedication have laid a solid foundation for the smooth progress of the project.