Zhongjiang Fifth Construction: Small mergers and acquisitions and large layout companies successfully entered the new track

   Different from the dense tower cranes and dusty tower cranes on traditional construction sites, at the construction site of Zhanguang Wind Power Project in Julu County, Xingtai City, Hebei Province, the 1,000-ton intelligent hoisting equipment is accurately docked with the 180-meter ultra-high tower barrel, and the installation of large wind blades is smoothly completed through real-time wind condition monitoring and intelligent attitude control.

 

   In recent years, Zhongjiang five construction in accordance“Old business stable foundation, new track to create incremental”The development of ideas, focusing on technology research and development and qualification breakthroughs, the implementation“Technical Breakthrough Qualification Break”The two-wheel drive strategy, based on the stabilization of traditional advantageous sectors such as industrial plants, has successfully expanded to the green energy fields encouraged by the state, such as wind power and photovoltaics.“Follower”To“Breakout”The role of change. In 2025, Zhongjiang Fifth Construction won the bid of 1.57 billion yuan with a total installed capacity of 200 megawatts in Julu County, Xingtai, Hebei Province, setting a new high in the scale of individual projects undertaken since the establishment of the company, marking a leap forward in the field of strategic emerging industries.

   Strategic M & A was qualified and successfully shortlisted for the new track.     

   Different from the transformation path of traditional construction enterprises, Zhongjiang Fifth Construction faces the triple bottleneck of serious internal volume of traditional business, lack of qualification of power engineering and insufficient reserve of new energy technology, which puts forward higher requirements for market access and technology adaptation. In order to broaden the new track, as early as the end of 2023, the company had a keen insight into the development trend of the wind power industry, decisively started the qualification upgrade and capacity reserve work, completed the acquisition of Shaanxi Zhongjiang Electric Power Construction Co., Ltd. through strategic mergers and acquisitions, quickly obtained the relevant qualifications of power engineering, and laid a solid foundation for project bidding. At the same time, the integration of resources to build a technology research and development platform, in view of the 180-meter ultra-high tower hoisting and other core construction links to tackle technical difficulties, combined with the construction needs of new energy projects to optimize the construction plan, the formation of differentiated competitive advantages, successfully opened up wind power, photovoltaic and other hundreds of billions of market space.

   Qualification Breakthrough (Market Access) Follow“Mergers and acquisitions first, independent upgrade”The core concept, Zhongjiang Five Construction through strategic mergers and acquisitions to quickly fill the qualification short board, the acquisition of Shaanxi Zhongjiang Power Construction Co., Ltd. has the power engineering construction general contracting three-level qualification and "construction (repair, test) power construction license", to provide key support for entering the new energy market. At the same time, through the project practice to accumulate performance, temper the team, continue to improve the qualification system, in order to undertake larger-scale, higher-level new energy projects to lay the foundation, become an important grasp of the state-owned capital to the new field of war layout.

   Deep-cultivated regional expansion of the market, the national layout of new infrastructure.    

   With the accelerated expansion of the new energy business, the company is actively building“regional deep cultivation national layout”The market network has successively landed new energy infrastructure projects in Xinjiang, Jiangsu, Guangdong, Hebei, Shanxi and other places, forming a business layout covering photovoltaic, wind power and other fields. By accurately grasping industry trends, laying out qualifications and technical reserves in advance, and optimizing the layout of state-owned capital, we will seize the opportunity in the rapid development of the new energy industry and succeed from traditional construction enterprises.“broken circle”It has become an important participant in the field of green energy construction, providing replicable practical experience for the reform and transformation of enterprises.   

   “Honesty must be the knot of the world, and ambition is not far from mountains and seas.”, Zhongjiang people will continue to uphold“Do a project, tree a monument”The solemn commitment to faith, to synthesize things, give full play“Dare, capable, good”The iron army style, with professionalism, compliance concept, excellent quality to create a new era of green energy construction model.