The first glass unit plate in the G74 plot implemented by the curtain wall company was successfully hoisted
On the morning of April 16, at the construction site of the NO.2021G74 plot project, with the start of the hoisting equipment, a unit plate glass with a length of 4 meters, a width of 1.25 meters and a weight of 310kg slowly rose against the blue sky and white clouds. When the hoisting reaches the designated position, the construction personnel quickly grasp the rope tied to the glass and jointly embed it into the special base of the glass curtain wall, and the first glass unit plate is installed smoothly.

The G74 plot project is located in the southern new city of Nanjing, and its outer enclosure structure adopts the most advanced unit glass curtain wall and back bolt dry hanging stone curtain wall system in the domestic curtain wall industry. According to the relevant provisions of the national and local standards of Jiangsu Province, it is a building curtain wall project constructed by assembly. Curtain wall company adopts the method of truck crane and hanging basket for high-altitude operation to carry out vertical transportation and installation of unit plates, and combines the construction technology of assembled curtain wall keel to carry out installation and construction. Compared with vertical lifting and installation on the ground, it can save about 1/3 of the construction period, which greatly promotes the rapid construction of the external curtain wall of the project.
The hoisting of the glass unit plate is not only an important node of the project construction, but also an important breakthrough for the curtain wall company in the professional field of prefabricated building curtain wall engineering, and it has also laid a solid foundation for the next step to accelerate the development of strategic emerging industries. The curtain wall company will continue to uphold“Quality assurance, value creation”The core values, high standards to promote the construction of the project, to ensure that the curtain wall on schedule to complete the construction.

2024 is a key year for the Group to promote the reform and deepening of state-owned enterprises. Curtain wall company actively responds to the group's new industry construction and development goals, with the main responsibility of the main industry as the core, comprehensive planning of the layout of the new industry, with new quality productivity to drive the company's sustained and healthy development. The company will strengthen scientific and technological innovation, strive to make breakthroughs in new technologies, new materials and new processes, and make positive contributions to the group's high-quality development and building a leading enterprise in Jiangsu construction industry.

